Skip to content
Projects Consulting India
The Adhoya ROB in Haryana, its continuous voided-slab viaduct curving across green paddy fields on tall piers

Road Over Bridges · Adhoya Chappar Road, Ambala District, Haryana

Adhoya ROB

Imprint as Aesthetic and Sustainable Engineering Design

Location
Adhoya Chappar Road, Ambala District, Haryana
PCI's role
Design
Structure
Continuous integral voided-slab viaduct
Railway span
50 m

This ROB has been constructed to facilitate the free movement of traffic at level crossing no. 109-C, at km 233/03-05, between the Mustfabad–Barara railway stations on the SREUMB section of the DFCC route.

Salient Features

  • Railway Span: 50 m
  • Viaduct Span: Continuous integral voided slab
  • Span Arrangement: 1 @ 22.5 m + 4 @ 30 m + 1 @ 23.25 m + 50.16 m (railway span) + 1 @ 23.25 m + 4 @ 30 m + 1 @ 22.5 m