
Road Over Bridges · Adhoya Chappar Road, Ambala District, Haryana
Adhoya ROB
Imprint as Aesthetic and Sustainable Engineering Design
- Location
- Adhoya Chappar Road, Ambala District, Haryana
- PCI's role
- Design
- Structure
- Continuous integral voided-slab viaduct
- Railway span
- 50 m
This ROB has been constructed to facilitate the free movement of traffic at level crossing no. 109-C, at km 233/03-05, between the Mustfabad–Barara railway stations on the SREUMB section of the DFCC route.
Salient Features
- Railway Span: 50 m
- Viaduct Span: Continuous integral voided slab
- Span Arrangement: 1 @ 22.5 m + 4 @ 30 m + 1 @ 23.25 m + 50.16 m (railway span) + 1 @ 23.25 m + 4 @ 30 m + 1 @ 22.5 m
